Skip to content
Bel CampersBelcampers
Services
Estimate
Camper Guide
Work
The workshop
Estimate
Talk to Belcampers
…
Bel Campers

Camper workshop

Carrer del Cimà, 20, 17481 Sant Julià de Ramis, Girona

L–V 09:00–18:00 · Open now

ServicesFull conversionOne-off installationsRepair & maintenanceEstimateHomologaciónCamper GuideContact
+34 637 136 914info@belcampers.combelcampers.comInstagram
Legal noticePrivacyCookies

Insulate the van properly

Stage 2 · Prepare the van · Without proper insulation the van is cold in winter and an oven in summer. We layer it at Belcampers.

9 min read·Belcampers editorial guide

In short

Insulation is not just sticking foam—it combines thermal material, vapour barrier, and thermal bridge sealing. In the workshop we calculate thickness by use and zone.

  1. Thermal and vapour layers
  2. Critical zones
  3. Sound deadening
  4. Panelling integration

Before you start

  • Finish windows and hatches before roof insulation.
  • Dry bodywork after rust treatment.
  • Decide on extra sound deadening in wheel arches.
  • Accept that thickness eats interior millimetres.

Thermal and vapour layers

We use rock wool or fibre on walls, reflective where it helps, and different treatment on floor and roof. Vapour barrier sits on the warm side to keep condensation off steel. Alexis marks vent paths and never blocks drains. Spray foam is for specific projects only—not the only answer. Each layer adds millimetres that later affect furniture fit.

Critical zones

Wheel arches, pillars, and door frames are thermal bridges. Reinforcement and deadening go there first. Post-hatch roof needs continuous insulation. Floor gets rigid base over insulation in our camper floor system. Sliding and rear doors are treated without jamming mechanisms. In Girona winter users validate real-world comfort.

Sound deadening

Butyl sheets and mats cut empty panel resonance. They do not replace thermal insulation but improve motorway comfort. We apply in phases before closing panels. Roof weight excess is not worth it—we balance. Clients from bare vans notice acoustic change the first door close after this phase.

Panelling integration

We leave battens for later lining. Cable routes and electrical access are reserved before walls close. Belcampers does not sell loose rolls—insulation is in prep quote. DIY material without plan often gets dismantled when the electrician arrives.

Common mistakes

  • Insulating over damp steel or active rust.
  • Using thin DIY foam everywhere.
  • Blocking factory drain holes.

When to bring it to the workshop

Too hot or cold on the road? Request professional insulation at Belcampers.

WhatsApp with context
EstimateContact

FAQ

What thickness do you recommend?

Depends on van and winter use. We set it in the project, not one universal number.

Insulation before or after floor?

Floor and walls are coordinated; camper floor has its own layer per our floor guide.

Sources & references

  • Vehicle insulation technical guides — European manufacturers
  • Manual de Reformas de Vehículos (MITMA)

Previous

Install roof hatches and roof openings

Next

Camper floor: base, levelling, finish